Commercial Firestop Contractor · The Midwest Region

Fire Proofing Specialties LLC

FPS LLC

Safeguarding the Heartland.

Firestopping done right the first time.

We install through-penetration, joint, and perimeter firestop systems to the listed UL system — and document every one for inspection.

Serving Indiana & Ohio

Expanding across the Midwest

UL-listed systems, installed to spec

No field improvisation

Manufacturer-trained installers

Certified to the standard

Documentation for inspection & closeout

Photo logs and closeout binders

What We Do

Firestopping services

UL-listed systems, engineered documentation, and inspection-ready installs — across every penetration, joint, and perimeter condition.

Through-Penetration Firestopping

UL-listed firestop systems that seal pipes, conduit, cable tray, and duct penetrations through fire-rated walls and floors.

  • Pipes, conduit, cable tray, duct, and sleeve penetrations
  • UL-listed system selection matched to substrate and penetrant
  • Fire-rated sealants, firestop collars, and intumescent wraps

+2 more on this page

View service details

Fire-Rated Joint Systems

Movement-rated firestopping for head-of-wall, bottom-of-wall, wall-to-wall, and floor-to-floor construction joints.

  • Head-of-wall and bottom-of-wall joint systems
  • Wall-to-wall and floor-to-floor expansion joints
  • Movement-rated sprays and sealants for dynamic joints

+2 more on this page

View service details

Perimeter Fire Containment

Curtain wall and edge-of-slab systems that stop fire and smoke from traveling floor to floor at the building perimeter.

  • Curtain wall and edge-of-slab perimeter systems
  • Safing insulation installation to spec thickness and density
  • Smoke seal detailing at slab edge and mullion conditions

+1 more on this page

View service details

Smoke & Acoustical Sealing

Smoke partition and sound-rated assembly sealing to support life-safety and acoustic performance requirements.

  • Smoke partition sealing above ceilings and at penetrations
  • Sound-rated (STC) assembly sealing for acoustic separation
  • Corridor and demising wall detailing

+1 more on this page

View service details

Firestop Documentation & Inspection Support

Complete documentation packages — UL system selection, engineering judgments, labeling, and inspection-ready photo logs.

  • UL system selection and submittal support
  • Engineering judgments (EJs) for non-standard conditions
  • System labeling at point of installation

+3 more on this page

View service details

Retrofit & Remediation

Firestop repair and upgrade work for existing buildings, including compliance-driven surveys and barrier management.

  • Existing building firestop repair and remediation
  • Healthcare and education compliance upgrades
  • Fire and smoke barrier management surveys

+1 more on this page

View service details

Why It Matters

Why firestopping matters

01

Life safety

Compartmentation keeps fire and smoke contained to its area of origin. A firestop system is only as good as its weakest penetration — every opening gets sealed to the tested assembly, not approximated.

02

Code & inspection

A failed firestop inspection stalls the schedule. Work installed to the listed system and documented as it's installed passes the first time, instead of triggering rework and a re-inspection cycle.

03

Warranty & manufacturer compliance

The right material for the assembly, installed within manufacturer conditions — substrate, annular space, and temperature limits — so the system performs as tested and the warranty holds.

Markets

Markets we serve

Different buildings, different penetration schedules. The system selection and sequencing change — the standard doesn't.

Data Centers

Dense cable and conduit penetrations, tight shutdown windows.

Commercial

Office, retail, and mixed-use tenant fit-outs and core buildouts.

Healthcare

Barrier management and occupied-facility work.

Education

Phased scopes that work around active class schedules.

Multifamily

High penetration counts across repeated unit layouts.

Industrial

Process penetrations coordinated with active facility operations.

Process

How a project moves

01

Walk

Site walk and penetration schedule — every wall, floor, and joint condition logged against the drawings.

02

Bid

Itemized proposal broken out by system and assembly, so scope and price are traceable line by line.

03

Install

Installed to the listed UL/ULC system, by manufacturer-trained crews, condition by condition.

04

Document

Labels at the point of installation, a photo log, and a closeout binder for the AHJ or third-party inspector.

Coverage

Serving the Midwest

Crews travel. Ask about your project location.

Full coverage details
  • Indiana
  • Ohio

Coming soon

  • Michigan
  • Kentucky
  • Illinois
  • Wisconsin
  • Missouri
  • Pennsylvania
  • West Virginia

Have a set of drawings? Send them over.

Quotes within one business day